Dexter |
Code of Ordinances |
Chapter 46. STREETS, SIDEWALKS AND CERTAIN OTHER PUBLIC PLACES |
Article III. STREET AND UTILITY RIGHT-OF-WAY |
§ 46-107. General worksite responsibilities.
The permittee or its subcontractors shall have a copy of the permit on the job site at all times. The permittee shall be responsible for the condition of any ROW repairs. Pavement repairs shall be warranted until the city shall overlay or reconstruct the pavement. Should the condition of the patch become such that additional pavement is in jeopardy of failure, the utility company may be held responsible for an area larger than the original repair. Other repairs (sidewalks, curb and gutter, trenches, etc.) shall be warranted for the reasonable life of such structures.
(Ord. No. 17-2003, § 8, 10-27-2003)